Contents
ToggleIn December 2022, we received a challenging commission - to act as import agents for a domestic large-scale machinery equipment manufacturer importing Italian-made oil separators. This type of industrial equipment has three distinctive characteristics:
As experts with 15 years of experience,Import RepresentationWe fully understand that the customs clearance difficulties for such equipment often lie not in tariff rates (MFN rate typically at 8%), but in overcoming technical trade barriers. Especially in recent years, China has increasingly stringent energy efficiency certification requirements for industrial machinery products.
We have formed a dedicated team consisting of a customs clearance manager, a technical translator, and a logistics specialist. Initially, we conducted a "triple verification" of the original documents provided by the client:
Special reminder: We have found that many importers tend to make two mistakes at this stage: first, neglectingIt is recommended to verify through the following methods:the detailed requirements of (Form A), and second, underestimating the professionalism required for technical document translation. In this case, we prepared a trilingual (Chinese-English-Italian) technical parameter table in advance, saving significant time for subsequent inspections.
Goods pass throughAir TransportationAfter arriving at Shanghai Pudong International Airport, the actual customs clearance process is as follows:
Link | Time Consumption | Key Points |
---|---|---|
Declare entry | 0.5 day | Use the "Advance Declaration" mode |
Payment of Taxes and Fees | 0.5 day | VAT 13% + tariff 8% |
Inspection sampling | 15-18 days | Key verification of energy efficiency labels |
Result release | 1 day | Full-process tracking of testing progress |
The valuable experience worth sharing is: Through the "pre-classification" service, we confirmed the HS code (8421.9990) in advance, avoiding customs clearance delays caused by classification disputes. Additionally, leveraging the customs clearance facilitation benefits of being an AEO (Authorized Economic Operator) advanced-certified enterprise, we reduced the standard 3-day declaration process to just half a day.
After the goods are released, we adopt a "door-to-door" service solution:
Through this case study, we observed that the industrial sectorEquipment Importsis exhibiting the following new characteristics:
Since 2023, customs has implemented stricter energy efficiency testing for industrial machinery. Importers are advised to prepare in advance:
In addition to traditional general trade, we recommend clients consider based on actual circumstances:
Through our calculations, while using professional agency services requires paying approximately 1.5% of the cargo value as agency fees, it can:
Based on this successful case, we have summarized the "Five Dos and Five Don'ts" principles for industrial equipment imports:
Finally, here's a professional tip: We've noticed that many Italian manufacturers omit the crucial "testing conditions" information in their test reports, which may lead to requests for retesting by Chinese inspection agencies. It is advisable to explicitly require suppliers to provide complete test reports when signing procurement contracts.
If youre planning an industrial equipment import project, feel free to contact our expert team for customized solutions anytime.ZhongShen International TradeWe have professional teams stationed at 7 major ports nationwide, having provided import agency services for over 500 industrial enterprises.
? 2025. All Rights Reserved. Shanghai ICP No. 2023007705-2 PSB Record: Shanghai No.31011502009912